One Platform for
All Your Stakeholders

Mirox brings Asset Managers, Technical Operators, and Investors together on one platform. Real-time monitoring, intelligent fault detection, and automated reporting. at 60% lower cost.1

Supported Assets

Monitor All Your
Renewable Energy Assets

Solar parks, wind turbines, and battery storage — all managed in one platform. One team, one view, one truth.

Solar Parks

Full visibility from string to feed-in meter. Detect issues at component level.

Wind Turbines

Per-turbine monitoring with performance curve validation and availability tracking.

+
+

Battery Storage

Track state of charge, charge cycles, and efficiency. Free with connected plants.

On-Site Intelligence

Smart Data Collection with Mirox-Agent

The Mirox-Agent is installed at your plant and actively collects data from all components. It works even when internet connectivity is limited, ensuring you never miss important data.

  • Auto-discovers your equipment
  • Works with limited connectivity
  • No manual configuration needed
  • Setup in under 24 hours

Why Teams Choose Mirox

Built by people who understand the daily challenges of managing renewable energy portfolios. Every feature solves a real problem.

Work Together, Not in Silos

Asset Managers and Technical Operators see the same data. No more reconciling different reports or wondering about real status.

Fewer False Alarms

Our digital twin understands your plant. It distinguishes expected conditions from actual faults, reducing noise and highlighting real issues.

Verify What You're Owed

Automatically check grid curtailment payments, direct marketer settlements, and warranty claims against actual data.

Reports That Write Themselves

Investor reports, technical performance summaries, compliance documentation — generated automatically.

Connect in 24 Hours

Our agent auto-discovers your equipment. No manual configuration, no on-site visits, no setup fees.2

Pay Less, Get More

Flat pricing per asset means a 50 MWp park costs the same as a 5 MWp park. Save 60% on a typical portfolio.1

60%

Lower Cost vs. Competitors1

<24h

To Connect2

€0

Setup Fees

Industry-First Flat Pricing

Simple Pricing, No Surprises

Unlike competitors who charge per MWp (€300-800/MWp/year), we charge a flat fee per asset — regardless of size. A 50 MWp park costs the same as a 5 MWp park. Save 60% on a typical portfolio.1

Solar Park Pricing

Per plant, up to 100 MWp

€150/month
Complete monitoring of all components
Intelligent fault detection
Automated performance reports
Unlimited users & stakeholders
Free onboarding & setup

Wind Turbine Pricing

Per turbine, any capacity

€45/month
Real-time production monitoring
Performance curve validation
Availability tracking
Unlimited users & stakeholders
Free onboarding & setup

Battery Storage Pricing

Per storage system, up to 100 MWp

€150/month
State of charge tracking
Charge/discharge monitoring
Performance analytics
Unlimited users & stakeholders
Free onboarding & setup

Small to medium parks? Batch them.

One €150/month subscription covers up to 4 plants with up to 4 MWp combined capacity — solar and battery freely combinable. A full bundle comes to €37.50 per plant per month.4

Why We Cost Less

Efficiency gains we pass on to you

Flat Per-Asset Pricing

Large parks pay the same as small ones. Your 50 MWp plant costs €150/month — not €27,500/year like with competitors.

Everything Included

No setup fees, no per-user charges, no extra costs for reports or API access. One price, everything included.

Free Onboarding

Asset connection within 24 hours at no cost. Competitors charge thousands for initial setup.

Get Started
Free setup & onboarding
60-day free test phase3
Monthly cancellation
All features included

Mobile App

Mirox for iPhone, iPad, Apple Watch and Android

Monitor your renewable energy portfolio — solar, wind, and battery storage — and get real-time alerts on the go. Available on the App Store and on Google Play. On iPad, lists and details sit side by side — in every orientation, Split View and Slide Over. On Apple Watch: fleet health, live power and open alerts at a glance, with widgets for your watch face and the Smart Stack.

Download Mirox on the App StoreGet Mirox on Google Play

Apple, the Apple logo, iPhone, iPad, and Apple Watch are trademarks of Apple Inc., registered in the U.S. and other countries and regions. App Store is a service mark of Apple Inc. Google Play and the Google Play logo are trademarks of Google LLC. Android is a trademark of Google LLC.

Mirox app on iPad: the dashboard with the day’s curve, fleet health and the latest tickets and notifications
Mirox app: the dashboard — production, losses and forecast on one timeline
Mirox on Apple Watch: fleet live power, today’s energy, sites OK and open alerts

Ready to Simplify Your Operations?

See how Mirox can bring your team together and save you money. Free pilot available — connect your first plant at no cost.

welcome@mirox.de
+49 (0) 40 76619191
Hamburg, Germany

60%

Cost Savings1

<24h

To Connect2

60 Days

Free Trial3